Reversed DUNK

July 24, 2023

In the night of 22.07.23, Studio Kim/IllI's steel pile was lifted onto the pre-assembled foundations in front of the new EDGE Tower in Berlin. Thanks to the careful preparatory work, the lifting was carried out smoothly in the scheduled time window with the help of two mobile cranes.

Back to the home page